Multiple Choice
Bohringer,Inc. ,manufactures and sells two products: Product A1 and Product X5.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs) required to produce that output appear below: The direct labor rate is $28.20 per DLH.The direct materials cost per unit is $256.50 for Product A1 and $165.20 for Product X5. The company has an activity-based costing system with the following activity cost pools,activity measures,and expected activity:
The activity rate for the Labor-Related activity cost pool under activity-based costing is closest to:
A) $40.46 per DLH
B) $1,390.21 per DLH
C) $89.20 per DLH
D) $66.90 per DLH
Correct Answer:

Verified
Correct Answer:
Verified
Q30: Mcleese,Inc. ,manufactures and sells two products: Product
Q31: Garhart Corporation uses the following activity rates
Q32: Neldon,Inc. ,manufactures and sells two products: Product
Q33: Schoeninger,Inc. ,manufactures and sells two products: Product
Q38: Accurso,Inc. ,manufactures and sells two products: Product
Q40: Punches,Inc. ,manufactures and sells two products: Product
Q55: Material handling is an example of a:<br>A)Unit-level
Q62: All other things the same, the unit
Q129: The activity rates in activity-based costing are
Q147: Testing a prototype of a new product