Multiple Choice
If the total projected error in an account balance was $3,248 and the tolerable error was set at $10,000, the auditor would:
A) conclude that the errors uncovered are material.
B) decide that further audit work was required.
C) conclude that the errors detected are not material.
D) conduct other tests aimed at the assertion being tested.
Correct Answer:

Verified
Correct Answer:
Verified
Q7: Sampling risk is the risk that the
Q8: Which of the following statements regarding statistical
Q16: An account is at a higher risk
Q23: Control risk is the risk that:<br>A) an
Q24: Tolerable error is the minimum error an
Q25: For high-risk accounts, the timing of most
Q34: Before selecting a sample, an auditor will
Q48: Indicate whether you agree or disagree with
Q52: Which of the following is a factor
Q65: When conducting detailed substantive procedures, auditors search