True/False
Acceptable risk of assessing control risk too low is the risk that the auditor is willing to take in accepting a control as effective when the true population exception rate is greater than the estimated population exception rate.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q20: In systematic sample selection, the population size
Q20: Which of the following is the risk
Q27: The relationship of tolerable exception rate (TER)
Q32: What is an auditor's evaluation of a
Q33: If the result obtained from a particular
Q35: The auditor's best estimate of the population
Q39: Even when nonsampling risk is zero, there
Q72: If an auditor judgmentally selects a sample
Q75: Attributes sampling would be an appropriate method
Q87: Which of the following is not a