Multiple Choice
Complete the following using the terms listed.
-The sequence of operations that require the longest time for completion is known as the _____.
A) process layout
B) LEED certification
C) Gantt chart
D) PERT chart
E) Inventory control
F) ISO
G) critical path
H) Computer-integrated manufacturing
I) Utility
J) perpetual inventory
K) Materials requirement planning
L) standardization
M) Routing
N) assembly line
O) robot
P) just-in-time
Q) benchmarking
R) synthetic production system
S) make,buy,or lease decision
Correct Answer:

Verified
Correct Answer:
Verified
Q21: A just-in-time inventory system seeks to eliminate
Q29: Computer-integrated manufacturing combines the use of robots,CAD/CAM,and
Q85: A product layout is one in which
Q96: Banks most likely utilize a _ layout.<br>A)product<br>B)fixed-position<br>C)process<br>D)customer-oriented
Q107: Hospital rooms are typically set up with
Q111: Which type of company would be most
Q118: Tamara is the owner of Baker's Dozen,a
Q120: Once a company decides what raw materials
Q121: A production system that reduces a raw
Q125: Grey Water Disposal wants to build a