Essay
Carlton construction is supplying building materials for a new mall construction project in Kansas. Their contract calls for a total of 250,000 tons of material to be delivered over a three-week period. Carlton's supply depot has access to three modes of transportation: a trucking fleet, railway delivery, and air cargo transport. Their contract calls for 120,000 tons delivered by the end of week one, 80% of the total delivered by the end of week two, and the entire amount delivered by the end of week three. Contracts in place with the transportation companies call for at least 45% of the total delivered be delivered by trucking, at least 40% of the total delivered be delivered by railway, and up to 15% of the total delivered be delivered by air cargo. Unfortunately, competing demands limit the availability of each mode of transportation each of the three weeks to the following levels (all in thousands of tons): The following is the LP model for this logistics problem.
What values would you enter in the Analytic Solver Platform (ASP) task pane for the cells in this Excel spreadsheet implementation of this problem?
Objective Cell:
Variables Cells:
Constraints Cells:
Correct Answer:

Verified
Correct Answer:
Verified
Q74: Robert Hope received a welcome surprise in
Q75: In modeling a problem it is usually
Q76: Pete's Plastics manufactures plastic at plants in
Q77: The LHS value of a constraint represents
Q78: Carlton construction is supplying building materials for
Q80: A company is planning production for the
Q81: The "Objective Value of" option in the
Q82: Exhibit 3.2<br>The following questions are based on
Q83: Scaling problems<br>A) can cause Analytic Solver Platform
Q84: Decision variables are sometimes referred to as