Essay
Carlton construction is supplying building materials for a new mall construction project in Kansas. Their contract calls for a total of 250,000 tons of material to be delivered over a three-week period. Carlton's supply depot has access to three modes of transportation: a trucking fleet, railway delivery, and air cargo transport. Their contract calls for 120,000 tons delivered by the end of week one, 80% of the total delivered by the end of week two, and the entire amount delivered by the end of week three. Contracts in place with the transportation companies call for at least 45% of the total delivered be delivered by trucking, at least 40% of the total delivered be delivered by railway, and up to 15% of the total delivered be delivered by air cargo. Unfortunately, competing demands limit the availability of each mode of transportation each of the three weeks to the following levels (all in thousands of tons): Formulate an LP model for this logistics problem.
Correct Answer:

Verified
Correct Answer:
Verified
Q45: You have been given the following linear
Q46: You have been given the following linear
Q47: Spreadsheet modeling is an acquired skill because<br>A)
Q48: Models which are setup in an intuitively
Q49: What action is required to make Analytic
Q51: Exhibit 3.5<br>The following questions are based on
Q52: A hospital needs to determine how many
Q53: You have been given the following linear
Q54: A solvable problem must have: <br>A) a
Q55: Objective cell, variable cells and constraint cells