Precision Brackets, Co. is considering switching from traditional allocation of overhead based on direct labor hours to an activity-based costing system. The manager has accumulated the following information on engineering changes for two of the company's major products:
Compute the cost per unit using:
(1) The traditional two-stage allocation of the costs of engineering changes based on direct labor hours.
(2) The activity-based cost allocation of the costs of engineering changes.
Precision Brackets, Co. is considering switching from traditional allocation of overhead based on direct labor hours to an activity-based costing system. The manager has accumulated the following information on engineering changes for two of the company's major products: Compute the cost per unit using: (1) The traditional two-stage allocation of the costs of engineering changes based on direct labor hours. (2) The activity-based cost allocation of the costs of engineering changes.

Correct Answer:

verifed

Verified

($400 x 5) + ($400 x 25) = $12,000 total...