Multiple Choice
One cause for the delay of the Boeing 787 Dreamliner was the ____.
A) braking system did not work properly
B) inability to trace lines of code back to specific system requirements for the braking system
C) decision to use electric brakes instead of conventional, hydraulically actuated brakes
D) inability to design the new brake system