Multiple Choice
Which of the following statements concerning MRP-based planning are TRUE?
A) Planning is based on historical data.
B) Planning is based on exploding the BOM.
C) Dependent demand is derived from independent demand.
D) It is used for low-value materials.
E) Planning is based on calculating a reorder point.
Correct Answer:

Verified
Correct Answer:
Verified
Q102: Replenishment lead time is<br>A)The time between placing
Q103: The MRP list,unlike the stock/requirements list,highlights changes
Q104: Which of the following are master data
Q105: Planning with final assembly takes into consideration
Q106: Which of the following are possible outcomes
Q108: A BOM always identifies the components needed
Q109: The BOM selection method in the material
Q110: The schedule lines control parameter applies to
Q111: Lot size dependent times remain the same
Q112: Which of the following statements best represents