Multiple Choice
Prototyping involves:
A) A standard systems development cycle using CASE tools
B) The rapid generation of a system by IS professionals,without the need for end user input
C) An iterative,interactive development process with extensive end user involvement
D) A fail-safe development process designed to ensure that an information system meets all user requirements,without revision
Correct Answer:

Verified
Correct Answer:
Verified
Q10: The conversion strategy where a system is
Q13: Systems design consists of three design activities:
Q55: Systems analysts may recycle back at any
Q65: User interface design refers to the development
Q78: Systems integrators specialize in providing industry-specific hardware,
Q79: By creating a logical model, the various
Q81: Software packages that are _ aren't a
Q109: _ hardware and software involves simulating the
Q122: Installing a new application may require converting
Q131: A feasibility study is a preliminary study