Piston rings for an automotive engine are produced by a forging process.We wish to monitor the inside diameter of the rings manufactured by this process using an and an s control chart.Samples of size 4 are to be taken at regular intervals,and the sample means and standard deviations are computed and plotted on the charts in time order.The target values for the inside diameter are a mean of = 75 millimeters and a standard deviation of = 0.02 millimeters.The control chart constants are (partially) reproduced below.
What is the center line for the s chart?
A) 0.018 millimeters
B) 0.02 millimeters
C) 0.04 millimeters
D) 75 millimeters
Correct Answer:

Verified
Correct Answer:
Verified
Q49: A variable is measured periodically on a
Q50: You have been invited to give a
Q51: Why is statistical control necessary?<br>A)If a process
Q52: C<sub>pk</sub> should be based on at least
Q53: Which of the following is an example
Q55: What condition is necessary for a process
Q56: Piston rings for an automotive engine are
Q57: Parts manufactured by an injection molding process
Q58: Which of the following is an example
Q59: At the start of the semester,a professor