A large book publisher has five manuscripts that must be edited as soon as possible. Five editors are available for doing the work, however their working times on the various manuscripts will differ based on their backgrounds and interests. The publisher wants to use an assignment method to determine who does what manuscript. Estimates of editing times (in hours) for each manuscript by each editor is:
-a) How many supply-side constraints are needed?
b) How many demand-side constraints are needed?
c) How many variables are involved in this assignment method?
Correct Answer:

Verified
Correct Answer:
Verified
Q23: The linear programming model for a transportation
Q86: The difference between the assignment and the
Q87: A professor needs help from three
Q88: Consider the following network representation of shipment
Q89: Madlantic Devices designs and manufactures high-end medical
Q90: For an assignment model, all the supply
Q92: Consider the following transportation problem:<br>
Q94: Sketch the network for this problem and
Q95: The assignment problem constraint x41 + x42
Q96: Write the assignment problem matrix below