The university is scheduling cleaning crews for its ten buildings. Each crew has a different cost and is qualified to clean only certain buildings. There are eight possible crews to choose from in this case. The goal is to minimize costs while making sure that each building is cleaned. The management science department formulated the following linear programming model to help with the selection process.
Min 200x1 + 250x2 + 225x3 + 190x4 +215x 5 + 245x6 + 235x7 + 220x8
s.t. x1 + x2 + x5 + x7 ? 1 {Building A constraint}
X1 + x2 + x3 ? 1 {Building B constraint}
X6 + x8 ? 1 {Building C constraint}
X1 + x4 + x7 ? 1 {Building D constraint}
X2 + x7 ? 1 {Building E constraint}
X3 + x8 ? 1 {Building F constraint}
X2 + x5 + x7 ? 1 {Building G constraint}
X1 + x4 + x6 ? 1 {Building H constraint}
X1 + x6 + x8 ? 1 {Building I constraint}
X1 + x2 + x7 ? 1 {Building J constraint}
Which of the crews is the least expensive?
A) Crew 1
B) Crew 2
C) Crew 3
D) Crew 4
E) Crew 5
Correct Answer:

Verified
Correct Answer:
Verified
Q66: If a firm wishes to choose at
Q67: A manufacturer produces both widgets and gadgets.
Q68: A parameter analysis report can be used
Q69: When binary variables are used in a
Q70: A new pizza restaurant is moving
Q71: A manufacturer has the capability to
Q72: Binary integer programming problems can answer which
Q73: A firm has prepared the following
Q75: If a firm wishes to choose at
Q76: If choosing one alternative from a group