Technical Engineering presently leases a copying machine on a monthly basis. The lease agreement requires a fixed fee each month in addition to a charge per copy. Technical Engineering made 2400 copies and paid a total of $162 in rent in September and in October they paid $195 for 3500 copies. Determine Technical Engineering's variable cost per copy.
A) $0.06
B) $0.04
C) $0.03
D) $0.01