Multiple Choice
A company manufactures two products, A and B, on two machines, I and II. It has been determined that the company will realize a profit of $4/unit of product A and a profit of $5/unit of product B. To manufacture 1 unit of product A requires 7 min on machine I and 9 min on machine II. To manufacture 1 unit of product B requires 9 min on machine I and 3 min on machine II. There are 6 hr of machine time available on machine I and 4 hr of machine time available on machine II in each work shift. What is the largest profit the company can realize?
A) $192
B) $202
C) $209
D) $204
E) $188
Correct Answer:

Verified
Correct Answer:
Verified
Q15: Use the simplex method for solving nonstandard
Q16: Solve the linear programming problem by the
Q17: Consider the linear programming problem. <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB6027/.jpg"
Q18: Consider the linear programming problem. <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB6027/.jpg"
Q19: Use the simplex method for solving nonstandard
Q21: Use the simplex method for solving nonstandard
Q22: Consider the linear programming problem. <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB6027/.jpg"
Q23: Ashley has earmarked at most $200,000 for
Q24: Solve the linear programming problem by the
Q25: Use the simplex method for solving nonstandard