Multiple Choice
For a particular time study a company would like to be 90% confident that the average job cycle time is within 5% of the true average job cycle time. Assume that the average job cycle time is 15.76 minutes and the standard deviation of the sample is 3.2 minutes. The number of cycles that should be used in this time study would be
A) 45.
B) 93.
C) 127.
D) 236.
Correct Answer:

Verified
Correct Answer:
Verified
Q2: The normal time to perform a job
Q3: Rating worker performance is typically an objective,easy
Q6: Workers often do not like to be
Q10: As part of its quality-improvement program a
Q14: The basic principle underlying an incentive piece-rate
Q15: _ time is the time required by
Q18: How many cycles should be used in
Q20: The historical objective behind work measurements and
Q23: Management believes a critical piece of equipment
Q26: In a time study the standard time