Multiple Choice
As part of a time study a particular job was analyzed. The study included 20 job cycles and the following cumulative times and performance rating factors for each element were reported: Assuming an allowance factor of 20% the standard time for this job would be
A) 10.08 minutes.
B) 12.10 minutes.
C) 14.73 minutes.
D) 16.58 minutes.
Correct Answer:

Verified
Correct Answer:
Verified