Multiple Choice
A project manager needs to allocate a staff of 460 employees to a 3-stage project. Stage 2 must have 20% more staff than Stage 1. Stage 3 required 50% more than Stage 2. Determine the number of employees needed for stage 1, 2 and 3 respectively.
A) Stage 1 = 115; Stage 2 = 138; Stage 3 = 207
B) Stage 1 = 120; Stage 2 = 120; Stage 3 = 320
C) Stage 1 = 320; Stage 2 = 120; Stage 3 = 120
D) Stage 1 = 207; Stage 2 = 115; Stage 3 = 138
E) Stage 1 = 200; Stage 2 = 100; Stage 3 = 60
Correct Answer:

Verified
Correct Answer:
Verified
Q96: Evaluate to six-figure accuracy: (1 + 0.055)<sup>1/6</sup>
Q97: Solve for the unknown rounded to
Q99: After a 5.25% raise, Johnny earned $19.28
Q100: $100 is 10% less than what amount?
Q102: $754.30 is what percent less than $759.00?
Q103: Sam has $20,000 to invest. He invested
Q104: Evaluate the following: 2.48832<sup>1/5</sup> =<br>A) 95.396217<br>B) 0.0104826<br>C)
Q105: Use the graphical method to solve the
Q106: Solve for the unknown rounded to
Q283: Evaluate to six-figure accuracy:<br> <span class="ql-formula"