Essay
A task involves positioning two metal parts with a rubber gasket sandwiched between them,inserting two bolts into predrilled holes,threading a nut onto each bolt,and tightening each bolt with a pneumatic wrench.In a preliminary study,the manager observed one of his workers performing this task five times.The observations were made in an air-conditioned,well-lit training facility,at ground level,with all tools and equipment clean and readily available.
a.What is the average observed time for this task?
b.What is the normal time for this task if the employee worked at a 10% slower pace than is typical for adequately trained workers?
c.What is standard time for this task if allowances sum to 14%?
Correct Answer:

Verified
a.Actual observed time is 286/...View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q11: In a time study,what is the required
Q12: Describe some impacts of noise in the
Q87: Flow diagrams are used to analyze:<br>A) movement
Q117: Management and labor share the labor cost
Q121: A manager who is conducting a time
Q175: What are predetermined time standards?
Q177: Which of these is the most common
Q202: Work sampling estimates the percent of time
Q236: Which of the following terms implies an
Q241: _ estimates the percent of time that