Multiple Choice
Suppose that you have taken 30 samples of 200 units each and calculated the proportion defective as p = .075.What is the upper control limit for a p-chart (rounded to 4 decimals) ?
A) .2192
B) .0191
C) .1309
D) .7500
Correct Answer:

Verified
Correct Answer:
Verified