Multiple Choice
If a work center has no empty containers,the workers at the work center will do which of the following?
A) Continue to produce as much inventory as they can
B) Produce enough inventory to meet the following day's demand
C) Produce enough inventory to satisfy the master production schedule
D) Stop production
Correct Answer:

Verified
Correct Answer:
Verified
Q2: External setup time refers to:<br>A)The time it
Q25: Reduction of setup time is accomplished by
Q25: Value stream maps are similar to flowcharts
Q27: If it takes 100 minutes to complete
Q28: With lean thinking,a company's operations layout should
Q30: Which of the following is not an
Q31: The ideal lot size for a lean
Q31: Which of the following is not required
Q32: With regards to suppliers,lean systems typically require:<br>A)Delivery
Q33: Why is production leveled in a lean