Multiple Choice
The time it takes a container to complete an entire circuit consists of:
A) Move time,time used,and wait time
B) Wait time,run time,setup time,and idle time
C) Fill time,wait time,move time,time used,and time to be returned to be filled again
D) None of the above
Correct Answer:

Verified
Correct Answer:
Verified