Takt time is calculated by taking demand over some period divided by the available time for production during that period.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q6: The Japanese term for waste is "gemba."
Q7: A Kanban card system finds good utility
Q8: What are the five essential elements of
Q10: The key to reducing inventory is reducing
Q11: Kaizen events typically take between 1 to
Q12: For production control,lean pull systems are best
Q14: What are the eight forms of waste?
Q16: Poka-yoke is another term for stabilizing the
Q17: The ideal setup time for a lean
Q34: One-touch setups could require as long as