Multiple Choice
A high level process map
A) works forward from a performance goal to the desired output
B) contains only the essential building blocks of a process
C) begins with a detailed analysis of the current process
D) provides a new process design that is so thorough a pilot study is rarely needed
Correct Answer:

Verified
Correct Answer:
Verified