True/False
The time required for a worker to complete one pass through the operations assigned to her is called the operator cycle time.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q56: Improved scheduling of materials,workers,and machines will most
Q57: Mass production means doing more with fewer
Q58: General purpose machines are an example of
Q59: Flexible resources is one of the basic
Q60: Reducing variability in production through more accurate
Q62: Which of the following are characteristic of
Q63: Waiting for parts to arrive or for
Q64: Setup time is not a component of
Q65: How many kanbans should circulate between two
Q66: One benefit of small lot production is