Multiple Choice
As part of a time study a particular job was analyzed.The study included 20 job cycles and the following cumulative times and performance rating factors for each element were reported: Assuming an allowance factor of 15%,the standard time for this job would be
A) 4.35 minutes.
B) 3.67 minutes.
C) 2.712 minutes.
D) 2.358 minutes.
Correct Answer:

Verified
Correct Answer:
Verified
Q11: Work sampling tends to be more disruptive
Q12: Work sampling is a technique for determining
Q13: How many observations should be taken to
Q14: The basic principle underlying an incentive piece-rate
Q15: _ time is the time required by
Q17: A work sampling study is being conducted
Q18: How many cycles should be used in
Q19: Determining the length of time it takes
Q20: The historical objective behind work measurements and
Q21: The allowance factor is a percentage increase