Multiple Choice
As part of a time study a particular job was analyzed.The study included 20 job cycles and the following cumulative times and performance rating factors for each element were reported: Assuming an allowance factor of 20% the standard time for this job would be
A) 10.08 minutes.
B) 12.10 minutes.
C) 14.73 minutes.
D) 16.58 minutes.
Correct Answer:

Verified
Correct Answer:
Verified
Q5: A time study is a statistical sample
Q6: Workers often do not like to be
Q7: Work sampling is an easier,cheaper,and quicker approach
Q8: Under normal circumstances and conditions,the time required
Q9: The normal times for basic,generic micro motions
Q11: Work sampling tends to be more disruptive
Q12: Work sampling is a technique for determining
Q13: How many observations should be taken to
Q14: The basic principle underlying an incentive piece-rate
Q15: _ time is the time required by