Multiple Choice
If α = 0.05 and β = 0.10,then __________.
A) AQL is 5 and LTPD is 10%
B) the customer expects to accept lots that exceed the LTPD about 5% of the time and the company expects to reject that are as good or better than the AQL about 10% of the time
C) the customer expects to accept lots that exceed the LTPD about 10% of the time and the company expects to reject that are as good or better than the AQL about 5% of the time
D) the customer expects to accept lots that exceed the AQL about 5% of the time and the company expects to reject that are as good or better than the LTPD about 10% of the time
Correct Answer:

Verified
Correct Answer:
Verified
Q18: Choosing among a single-,double- and multiple-sampling plans
Q19: Acceptance sampling is not consistent with TQM's
Q20: An operating characteristics (OC)curve is a graph
Q21: A multiple sampling plan is also referred
Q22: A(n)_ curve is a graph showing the
Q23: Acceptance sampling involves the inspection of a
Q24: The _ represents the upper limit to
Q26: Six Sigma companies report defective parts<br>A)per million.<br>B)per
Q27: All the following reasons are reasons acceptance
Q28: Acceptance sampling is based on the premise