Multiple Choice
Consider the assembly line below.The three fabrication operations run in parallel,such that each batch of 20 units only needs to go through one of the three fabrication operations.After that,each batch needs to go through both assembly operations,which occur simultaneously (specifically,10 components are made for each unit in the fabrication stage-some components are then assembled in the Assembly 1 area while others are assembled in the Assembly 2 area) .The units are packaged and made ready for shipment in the final stage. What is the bottleneck time per batch of this operation?
A) 24 min.
B) 8 min.
C) 88 min.
D) 34 min.
E) 3 min.
Correct Answer:

Verified
Correct Answer:
Verified
Q27: Capacity decisions are based on technological concerns,
Q45: Which of the following is not one
Q50: A work system has five stations that
Q51: Fabricators,Inc.wants to increase capacity by adding a
Q52: A retailer is considering building a large
Q91: Adding a complementary product to what is
Q113: Which of the following statements regarding fixed
Q115: Why is the capacity decision important?
Q167: Describe how EMV might be used to
Q228: Utilization is the number of units a