When a lot has been accepted by acceptance sampling,we know that:
A) it has more defects than existed before the sampling.
B) it has had all its defects removed by 100% inspection.
C) it will have the same defect percentage as the LTPD.
D) it has no defects present.
E) All of the above are false.