Multiple Choice
Figure 4-19
Attraction Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. In addition, there is a sustaining process with two activities: providing utilities (plant wide) and providing space. Costs have been assigned to each activity using direct tracing and resource drivers:
Activity drivers for each activity have been identified and their practical capacities listed:
The costs of facility-level activities are assigned using machine hours.
-Refer to Figure 4-19. What is (are) the unit-level activity(ies) ?
A) engineering
B) setups
C) providing space
D) machining
Correct Answer:

Verified
Correct Answer:
Verified
Q53: The proportion of an overhead activity consumed
Q106: Figure 4-6<br>The Fast & Furious Company produces
Q107: Funland Manufacturing Company produces specially machined parts.
Q108: Figure 4-16<br>Samson Company recently installed an activity-based
Q112: Avatar Corporation uses a predetermined rate to
Q113: Figure 4-19<br>Attraction Corporation produces specially machined parts.
Q114: Figure 4-17<br>X-TREME Corporation has the following activities:
Q115: Lonestar Corporation uses a job-order costing system
Q116: Figure 4-15<br>Carriage Manufacturing uses an activity-based costing
Q169: A possible solution to overcome distortions caused