Multiple Choice
Figure 4-20
Quasi-Tech Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. Costs have been assigned to each activity using direct tracing and resource drivers:
Owens produces two models: Model X and Model Y. The following table shows how the two products consume activity.
-Refer to Figure 4-20. How much overhead is assigned to Model C using the 4 activity drivers?
A) $2,820,000
B) $2,640,000
C) $2,060,000
D) $560,000
Correct Answer:

Verified
Correct Answer:
Verified
Q51: All of the following are unit-based activity
Q56: If activity-based costing is used, security is
Q71: Figure 4-7<br>The Cherokee Company uses a predetermined
Q73: Figure 4-7<br>The Cherokee Company uses a predetermined
Q74: Figure 4-1<br>The Foremost Company predicted factory overhead
Q81: Figure 4-16<br>Samson Company recently installed an activity-based
Q99: There are many two-driver combinations that may
Q131: Unit-based product costing uses which of the
Q173: Motorsports, Inc. had a predetermined overhead rate
Q185: A(n) _ is a grouping of logically