Multiple Choice
Figure 4-20
Quasi-Tech Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. Costs have been assigned to each activity using direct tracing and resource drivers:
Owens produces two models: Model X and Model Y. The following table shows how the two products consume activity.
-Refer to Figure 4-20. Determine the engineering costs assigned to model C using the two most expensive activities for cost pools. The costs of the two relatively inexpensive activities are allocated to the two most expensive activities in proportion to their costs. (Round to two decimal places.) The engineering cost assigned to model C would be
A) $2,819,930
B) $1,566,666.67
C) $566,666.67
D) $313,330
Correct Answer:

Verified
Correct Answer:
Verified
Q46: Which of the following is NOT a
Q60: Figure 4-11<br>Longview Manufacturing Company manufactures two products
Q62: Figure 4-14<br>Lawson Manufacturing has four categories of
Q67: Figure 4-10<br>The Manoli Company has collected the
Q68: Figure 4-9<br>Summer Manufacturing has four categories of
Q102: Non-unit-based drivers are factors that measure the
Q130: The difference between actual overhead and applied
Q144: Which of the following quantities is an
Q148: Activity-based costing uses only unit-level drivers for
Q191: Overhead assignments should reflect the amount of