Multiple Choice
Figure 4-20
Quasi-Tech Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. Costs have been assigned to each activity using direct tracing and resource drivers:
Owens produces two models: Model X and Model Y. The following table shows how the two products consume activity.
-Refer to Figure 4-20. First, determine the overhead costs assigned to model D using the two most expensive activities for cost pools. The costs of the two relatively inexpensive activities are allocated to the two most expensive activities in proportion to their costs. (Round to two decimal places.) What is the error in the overhead cost assigned to model D using ABC (4 driver model) as the benchmark?
A) $180,030
B) $240,700
C) $313,330
D) $626,650
Correct Answer:

Verified
Correct Answer:
Verified
Q6: Predetermined overhead rates are calculated at the
Q127: Maroone, Inc., has identified the following overhead
Q128: Figure 4-10<br>The Manoli Company has collected the
Q129: Figure 4-8<br>Tandem Company manufactures two products (D
Q130: Figure 4-8<br>Tandem Company manufactures two products (D
Q131: Figure 4-6<br>The Fast & Furious Company produces
Q133: The Roanoke plant of the Virginia Company
Q135: For a labor-intensive manufacturing operation, which of
Q135: The Data Retrieving Corporation provided the following
Q189: A(n) _ method first traces costs to