Multiple Choice
Figure 4-20
Quasi-Tech Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. Costs have been assigned to each activity using direct tracing and resource drivers:
Owens produces two models: Model X and Model Y. The following table shows how the two products consume activity.
-Refer to Figure 4-20. What are the global consumption ratios of Model C and D respectively? (round to two decimal places)
A) 0.20; 0.80
B) 0.42; 0.58
C) 0.56; 0.44
D) 0.84; 0.16
Correct Answer:

Verified
Correct Answer:
Verified
Q9: If activity-based costing is used, set-ups would
Q73: Batch-level costs are assigned using<br>A)non-unit-based activity drivers.<br>B)unit-based
Q78: The collected data sets that are organized
Q154: Figure 4-4<br>Mannitou Company made the following predictions
Q155: Figure 4-7<br>The Cherokee Company uses a predetermined
Q156: Account balances from the Boilermakers Company are
Q158: Figure 4-6<br>The Fast & Furious Company produces
Q160: Figure 4-10<br>The Manoli Company has collected the
Q161: Figure 4-16<br>Samson Company recently installed an activity-based
Q167: For labor-intensive operations, the most appropriate activity