Multiple Choice
Figure 15-2
The following information relates to Cranmore Manufacturing: To produce a unit of product:
Cutting department 5 minutes per unit
Welding department 8 minutes per unit
Polishing department 3 minutes per unit
Finishing department 4 minutes per unit
There is a wait time of 5 minutes before the cutting department begins a batch, 15 minutes between the cutting and welding departments, a move and pre-wait between welding and polishing of 12 minutes, and a move and pre-wait between the polishing and finishing departments of 8 minutes.
-Refer to Figure 15-2. If Cranmore produces in batches of 10 units, how much time would have elapsed by the time the 10th unit is produced under a manufacturing cell environment (assuming the cell is processing continuously) ?
A) 60 minutes
B) 65 minutes
C) 150 minutes
D) some other amount
Correct Answer:

Verified
Correct Answer:
Verified
Q24: The accounting approach designed to support and
Q80: Which is NOT a benefit of lean
Q85: A Box Scorecard is used by the
Q151: In value-stream reporting, the income statement reflects
Q152: Figure 15-4<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB2045/.jpg" alt="Figure 15-4
Q155: At the end of 2014, Diatomic Company
Q156: The productivity measure of all inputs simultaneously
Q158: At the end of 2014, Diatomic Company
Q159: Why might labor costs be reduced in
Q160: Information about Haulover Company is as follows: