Essay
You have been asked to balance a flow shop assembly operation to achieve an output rate of 80 units per eight-hour day.Task times and precedence relationships are shown in the table below.
a.Draw the precedence diagram.
b.Determine the desired cycle time.
c.Determine the theoretical minimum number of stations needed.
d.Balance this line using the most following tasks heuristic.
e.What is the efficiency of the line obtained in part d?
Correct Answer:

Verified
The precedence diagram appears...View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q10: If the schedule calls for the production
Q15: An assembly line with 11 tasks is
Q31: Process-oriented layouts typically have low levels of
Q47: Which of the following does NOT support
Q83: Mathematically, takt time is:<br>A) total work time
Q93: One guideline for determining the arrangement and
Q133: A manufacturing work cell has a takt
Q166: The major problem addressed by the process-oriented
Q220: _ is the maximum time that the
Q306: Which one of the following is NOT