At a new watch assembly plant,a job is divided into three work elements.The element times for the first four cycles are recorded by the continuous method and are presented below along with a performance rating factor (RF) for each element. The standard time for this job,assuming that the allowance is 18 percent,is:
A) fewer than or equal to 1.9 minutes.
B) greater than 1.9 minutes but fewer than or equal to 2.0 minutes.
C) greater than 2.0 minutes but fewer than or equal to 2.1 minutes.
D) greater than 2.1 minutes.
Correct Answer:

Verified
Correct Answer:
Verified
Q7: The _ of job element timing requires
Q11: Fatigue, rest, or unavoidable delays are not
Q37: The following times in seconds were observed
Q44: The work measurement technique that breaks down
Q47: The Dean's office is interested in determining
Q50: The gentleman farmer recorded the time it
Q56: A work standard is the time required
Q67: During a time study,the following times were
Q74: With a time study approach, the:<br>A) nature
Q93: When using a time study approach, the