Multiple Choice
Management at Pepman has decided to switch from a push system to a pull system of manufacturing. They are a large repetitive manufacturer of bicycles. Which one of the following is most likely to occur?
A) The cycle time will increase, resulting in higher inventory levels.
B) The space required will increase due to the increase in the number of units that require rework.
C) The decrease in WIP inventory levels will reduce the space requirements.
D) The workers at any given process will produce units before they are needed by the subsequent process.
Correct Answer:

Verified
Correct Answer:
Verified
Q77: Justin Thyme used to run one batch
Q78: What are the four underlying principles of
Q79: Use the data in Scenario 6.1 to
Q80: _ refers to the goal of having
Q81: A takt time of 90 seconds generates
Q83: Automatically stopping the process when something is
Q84: _ practices include early testing of machine
Q85: One benefit of a lean system is
Q86: What is the output for a process
Q87: The Japanese term for continuous improvement in