A job consists of three elements.Twenty observations for each element were timed,and the resulting data are shown in the following table.A performance rating has also been assigned for each element,as shown in the table.The job has an allowance of 20% of normal time.
-Use the information in Scenario 4.4.What is the normal time for job element #1?
A) greater than or equal to 3 minutes
B) less than 3 minutes but greater than or equal to 2.6 minutes
C) less than 2.6 minutes but greater than or equal to 2.2 minutes
D) less than 2.2 minutes
Correct Answer:

Verified
Correct Answer:
Verified
Q32: _ involves estimating the proportion of time
Q64: Scenario 4.3<br>A job consists of three elements.Twenty
Q71: The best data analysis tool for representing
Q73: Gaps between actual and desired performance are
Q123: The five categories of activities (operation, transportation,
Q181: A professor's graduate assistant can grade a
Q217: If a process under analysis is extensive
Q219: Good process management should include:<br>A) a mechanism
Q231: The first unit of production takes 20
Q235: An industrial engineer observes a brand new