Solved

Straker Industries Estimated Its Short-Run Costs Using a U-Shaped Average

Question 14

Multiple Choice

Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC) at Straker Industries is $1,000.   At what level of output is average variable cost AVC) at its minimum point for Straker Industries? A) 0.14 B) 4.7 C) 7 D) 14 E) 28 and obtained the following results.Total fixed cost TFC) at Straker Industries is $1,000. Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC) at Straker Industries is $1,000.   At what level of output is average variable cost AVC) at its minimum point for Straker Industries? A) 0.14 B) 4.7 C) 7 D) 14 E) 28 At what level of output is average variable cost AVC) at its minimum point for Straker Industries?


A) 0.14
B) 4.7
C) 7
D) 14
E) 28

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions