Multiple Choice
Timing the work elements using the snap-back method requires:
A) the worker to perform each job element as quickly as possible.
B) a larger sample size than using the continuous method.
C) the use of two stopwatches.
D) a smaller sample size than using the continuous method.
Correct Answer:

Verified
Correct Answer:
Verified