Multiple Choice
An industrial engineer is conducting a time study for a work element.The select time is 4.5 minutes,and the sample standard deviation of the observed time is 20 seconds.What is the appropriate sample size if the estimate is to be 5 percent of the true average time 95 percent of the time?
A) fewer than or equal to seven
B) greater than seven but fewer than or equal to eight
C) greater than eight but fewer than or equal to nine
D) greater than nine
Correct Answer:

Verified
Correct Answer:
Verified
Q8: The performance rating factor in a time
Q24: When using the MTM approach:<br>A) stopwatches are
Q25: What is the impact of greater reliance
Q42: The sample size needed for a time
Q48: A work sampling method is used to
Q49: Which one of the following statements about
Q56: A work standard is the time required
Q56: The Dean's office is interested in determining
Q69: Table H.3<br>A worker was observed for four
Q102: Table H.1<br>A worker was observed for four