Multiple Choice
The work measurement technique that breaks down tasks into a series of generic micro-motions is the:
A) time study method.
B) elemental standard data approach.
C) predetermined data approach.
D) work sampling method.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q39: A pilot work study has been conducted
Q40: As the sample size increases in a
Q41: A larger sample size is required when
Q42: The sample size needed for a time
Q43: Why would the elemental standard data approach
Q45: A major disadvantage of the work sampling
Q46: What are the limitations of time studies?
Q47: To set a time standard for a
Q48: The gentleman farmer recorded the time it
Q49: The more frequently the activity occurs, the