Multiple Choice
Table D.2
Bahouth Enterprises produces a variety of hookahs for clients around the globe. Their small plant has a highly flexible workforce that can switch between products seamlessly. They forecast using a six-month planning period and have a demand forecast as shown in the table. The per-unit costs for each output option the sales and operations planner has at his disposal are indicated in the table. Regular output costs $40 per unit, overtime production is $60 per unit, and subcontracting is $70 per unit. Holding inventory from one month to the next costs $2 per unit per month and a backlog costs $5 per unit per month. Regular plant capacity is 300 units per month.
-Use the information in Table D.2. If the planner decides to adopt a chase plan for the planning period, what will the regular output be for month 1?
A) 300 units
B) 350 units
C) 400 units
D) 450 units
Correct Answer:

Verified
Correct Answer:
Verified
Q11: For an "equal" constraint, only points _
Q12: A manager is interested in deciding production
Q13: A(n) _ limits the ability to improve
Q14: An = (equal to) constraint is often
Q15: A manufacturer builds finished items A, B,
Q17: A binding constraint has slack but does
Q18: Scenario D.1<br>Lisa lives out in the country
Q19: Belsky Manufacturing makes three models of fans,
Q20: _ is the amount by which the
Q21: D.5 The Transportation Method<br>Table D.1<br>Tanfastic, Inc., a