Scenario 11.1 Sunshine Manufacturing Produces Three Products: X,Y,Z.The Production of These End
Multiple Choice
Scenario 11.1
Sunshine Manufacturing produces three products: X,Y,Z.The production of these end items is controlled by an MRP system.Each end item X is assembled with two components of A and one component of B.Each end item of Y is assembled with two components of C and one component of A.End item Z is assembled from one unit of D and one unit of C;D is manufactured from one unit of A;and C is manufactured from one unit of B.
-Use the information in Scenario 11.1.If item C has a manufacturing lead time of two weeks,and a planned receipt of 65 units is needed in week 4,which of the following statements is TRUE?
A) The planned order release in week 2 for item C is 130 units.
B) The gross requirements for item B in week 4 is 65 units.
C) The gross requirements for item B in week 2 is 130 units.
D) The gross requirements for item B in week 2 is 65 units.
Correct Answer:

Verified
Correct Answer:
Verified
Q3: Dependent demand for an item occurs because
Q6: The sums of the quantities in the
Q25: A bill of materials (BOM) shows all
Q39: A bill of materials is a record
Q50: Explain the difference between independent and dependent
Q66: Table 11.1<br>Big Truck Tacos has developed the
Q72: Which statement on MRP explosion is BEST?<br>A)It
Q73: A firm's existing, older information system is
Q76: Scenario 11.3<br>Use this bill of materials and
Q114: In MRP, a(n) _ is an item