Multiple Choice
Scenario 2.5
A job consists of three distinct work elements that were timed with a highly accurate Swiss watch by a trained industrial engineer wearing a pristine white lab jacket and carrying an official-looking clipboard.Worker ratings were less inflated by the newness of the job elements to the worker than by the overall nervousness of the worker.The engineer recorded ten observations and assigned the performance rating that is recorded in the bottom row of the table under the corresponding work element.All recorded times are in seconds.
-Use the data in Scenario 2.5 to answer this question.If the rating factor is 15%,what is the normal time for Element 2?
A) 23.9 seconds
B) 27.5 seconds
C) 28.1 seconds
D) 31.6 seconds
Correct Answer:

Verified
Correct Answer:
Verified
Q76: The _ in a service blueprint separates
Q83: Petroleum refineries typically use continuous flow processes.
Q122: A learning curve is a line showing
Q132: How can flowcharts and process charts be
Q139: The product-process matrix used to analyze manufacturing
Q161: _ is based on comparison of processes
Q165: _ automation can handle various products through
Q185: The first unit of production takes 20
Q204: A restaurant manager tracks complaints from the
Q230: Front offices typically emphasize:<br>A) low cost operations