Multiple Choice
Scenario 2.5
A job consists of three distinct work elements that were timed with a highly accurate Swiss watch by a trained industrial engineer wearing a pristine white lab jacket and carrying an official-looking clipboard.Worker ratings were less inflated by the newness of the job elements to the worker than by the overall nervousness of the worker.The engineer recorded ten observations and assigned the performance rating that is recorded in the bottom row of the table under the corresponding work element.All recorded times are in seconds.
-Use the data in Scenario 2.5 to answer this question.If the rating factor is 10% and the allowance is 15%,what is the standard process time?
A) 110.69 seconds
B) 82.62 seconds
C) 109.27 seconds
D) 95.02 seconds
Correct Answer:

Verified
Correct Answer:
Verified
Q9: Scenario 2.6<br>You currently purchase a part used
Q48: Based on the data in Table 2.15
Q49: Field service representatives are classified as a:<br>A)back
Q57: Highly customized job processes and processes that
Q116: Which of these questions is not one
Q121: Which work measurement technique breaks down tasks
Q126: An off-diagonal position in the product-process matrix
Q142: An effective tool for showing steps of
Q196: Which one of the following groups of
Q223: The authors discuss seven mistakes when managing