Deck 15: Quality Tools, Metrics, Testing and Project Management in Software Development

Full screen (f)
exit full mode
Question
Maintenance Plan predicts the maintenance requirements of the system, maintenance costs and effort required
Use Space or
up arrow
down arrow
to flip the card.
Question
Beta testing will be done by

A)developer
B)user
C)tester
Question
Validation plan describes the approach ,resources and schedule used for system validation
Question
Integration, It will come under

A)cmm level 1
B)cmm level 3
C)cmm level 2
D)none
Question
Types of quality tools are Problem Identification Tools and Problem Analysis Tools.
Question
Which Software Development Life cycle model will require to start Testing Activities when starting development activities itself

A)water falls model
B)spiral model
C)v-model
D)linear model
Question
A metric used to measure the characteristic of the methods, Techniques and tools employed in developing, implementing and maintaining the software system called as

A)process metric
B)product metric
C)test metrics
Question
Check Sheet(Checklist. is considered a simple , but powerful statistical tool because it differentiates between two extremes.
Question
Application should be stable. Clear Design and Flow of the application is needed for Automation testing.
Question
Quality plan describes the quality procedures and standards that will be used in a project.
Question
How severely the bug is effecting the application is called as

A)severity
B)priority
C)fix ability
D)traceability
Question
Project Risk affects The Schedule or Resources.
Question
The name of the testing which is done to make sure the existing features are not affected by new changes

A)recursive testing
B)whitebox testing
C)unit testing
D)regression testing
Question
Management and Measurement, It will come under

A)cmm level 1
B)cmm level 3
C)cmm level 4
D)cmm level 2
Question
AdHoc testing is a part of

A)unit testing
B)regression tesing
C)exploratory testing
D)performance testing
Question
Cost of Production = Right The First time cost(RTF. + Cost of Quality.
Question
------------- means under what test environment(Hardware, software set up. the application will run smoothly

A)test bed
B)checkpoint
C)code walk through
D)checklist
Question
Optimization, Defect Prevention, and Quality Control. Its come under the

A)cmm level 2
B)cmm level 3
C)cmm level 4
D)cmm level5
Question
Unit Testing will be done by

A)testers
B)end users
C)customer
D)developers
Question
Beta testing will be done at

A)user place
B)developers place
Question
A Plan to overcome the risk called as

A)migration plan
B)master plan
C)maintenance plan
D)mitigation plan
Question
Which of the following is not included in failure costs?

A)rework
B)repair
C)failure mode analysis
D)none of the mentioned
Question
Which requirements are the foundation from which quality is measured?

A)hardware
B)software
C)programmers
D)none of the mentioned
Question
Which of the following is not a SQA plan for a project?

A)evaluations to be performed
B)amount of technical work
C)audits and reviews to be performed
D)documents to be produced by the sqa group
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/24
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 15: Quality Tools, Metrics, Testing and Project Management in Software Development
1
Maintenance Plan predicts the maintenance requirements of the system, maintenance costs and effort required
True
2
Beta testing will be done by

A)developer
B)user
C)tester
user
3
Validation plan describes the approach ,resources and schedule used for system validation
True
4
Integration, It will come under

A)cmm level 1
B)cmm level 3
C)cmm level 2
D)none
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
5
Types of quality tools are Problem Identification Tools and Problem Analysis Tools.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
6
Which Software Development Life cycle model will require to start Testing Activities when starting development activities itself

A)water falls model
B)spiral model
C)v-model
D)linear model
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
7
A metric used to measure the characteristic of the methods, Techniques and tools employed in developing, implementing and maintaining the software system called as

A)process metric
B)product metric
C)test metrics
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
8
Check Sheet(Checklist. is considered a simple , but powerful statistical tool because it differentiates between two extremes.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
9
Application should be stable. Clear Design and Flow of the application is needed for Automation testing.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
10
Quality plan describes the quality procedures and standards that will be used in a project.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
11
How severely the bug is effecting the application is called as

A)severity
B)priority
C)fix ability
D)traceability
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
12
Project Risk affects The Schedule or Resources.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
13
The name of the testing which is done to make sure the existing features are not affected by new changes

A)recursive testing
B)whitebox testing
C)unit testing
D)regression testing
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
14
Management and Measurement, It will come under

A)cmm level 1
B)cmm level 3
C)cmm level 4
D)cmm level 2
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
15
AdHoc testing is a part of

A)unit testing
B)regression tesing
C)exploratory testing
D)performance testing
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
16
Cost of Production = Right The First time cost(RTF. + Cost of Quality.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
17
------------- means under what test environment(Hardware, software set up. the application will run smoothly

A)test bed
B)checkpoint
C)code walk through
D)checklist
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
18
Optimization, Defect Prevention, and Quality Control. Its come under the

A)cmm level 2
B)cmm level 3
C)cmm level 4
D)cmm level5
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
19
Unit Testing will be done by

A)testers
B)end users
C)customer
D)developers
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
20
Beta testing will be done at

A)user place
B)developers place
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
21
A Plan to overcome the risk called as

A)migration plan
B)master plan
C)maintenance plan
D)mitigation plan
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
22
Which of the following is not included in failure costs?

A)rework
B)repair
C)failure mode analysis
D)none of the mentioned
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
23
Which requirements are the foundation from which quality is measured?

A)hardware
B)software
C)programmers
D)none of the mentioned
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
24
Which of the following is not a SQA plan for a project?

A)evaluations to be performed
B)amount of technical work
C)audits and reviews to be performed
D)documents to be produced by the sqa group
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
locked card icon