Validation plan describes the approach ,resources and schedule used for system validation

Free
(True/False)
4.8/5
(33)
Correct Answer:
Verified

True

Cost of Production = Right The First time cost(RTF. + Cost of Quality.

Free
(True/False)
4.9/5
(29)
Correct Answer:
Verified

True

Quality plan describes the quality procedures and standards that will be used in a project.

Free
(True/False)
4.8/5
(34)
Correct Answer:
Verified

True

A metric used to measure the characteristic of the methods, Techniques and tools employed in developing, implementing and maintaining the software system called as

(Multiple Choice)
4.8/5
(35)

Application should be stable. Clear Design and Flow of the application is needed for Automation testing.

(True/False)
4.8/5
(33)

Which of the following is not a SQA plan for a project?

(Multiple Choice)
4.8/5
(41)

Unit Testing will be done by

(Multiple Choice)
4.9/5
(34)

AdHoc testing is a part of

(Multiple Choice)
4.9/5
(23)

Maintenance Plan predicts the maintenance requirements of the system, maintenance costs and effort required

(True/False)
4.8/5
(39)

Beta testing will be done by

(Multiple Choice)
4.9/5
(37)

Integration, It will come under

(Multiple Choice)
4.8/5
(39)

Management and Measurement, It will come under

(Multiple Choice)
4.9/5
(29)

Check Sheet(Checklist. is considered a simple , but powerful statistical tool because it differentiates between two extremes.

(True/False)
4.9/5
(30)

The name of the testing which is done to make sure the existing features are not affected by new changes

(Multiple Choice)
4.8/5
(42)

Which of the following is not included in failure costs?

(Multiple Choice)
4.9/5
(37)

------------- means under what test environment(Hardware, software set up. the application will run smoothly

(Multiple Choice)
4.9/5
(36)

Which Software Development Life cycle model will require to start Testing Activities when starting development activities itself

(Multiple Choice)
4.9/5
(37)

Optimization, Defect Prevention, and Quality Control. Its come under the

(Multiple Choice)
4.8/5
(44)

A Plan to overcome the risk called as

(Multiple Choice)
4.8/5
(34)

Types of quality tools are Problem Identification Tools and Problem Analysis Tools.

(True/False)
4.7/5
(40)